We would like to set up a longitudinal study based on an iterate survey which shall be answered in five points in time. At the beginning and at the end of the study, the long version of the survey shall be used and in between the short version. How can this be implemented?
You could insert a hidden equation question and show/hide groups based on the equation value. The equation value could be changed between iterations in an activated survey.
Cheers,
Tony Partner Solutions, code and workarounds presented in these forums are given without any warranty, implied or otherwise.